• 소개
    • 회사 소개
    • 회사 정보
    • 회사 실적
    • 품질 & 안전 방침
    • 행동 규칙
  • 제품 - 서비스
    • 철골구조 & 조립식 철골(PEB)
    • 철근
    • 철근 용접망
    • 강코일 - 강판
    • 건축부자재 솔루션
    • 마감재
  • 프로젝트
  • 소식
    • 뉴스
    • 이벤트
    • 영상
  • 한국
    • Tiếng Việt
    • English
    • 中文
    • 日語
    • 한국
  • Tiếng Việt
  • English
  • 中文
  • 日語
  • 한국
뉴스
  1. 홈페이지
  2. 미디어
  3. NOTICES IN THE CONSTRUCTION OF PRE-ENGINEERED BUILDINGS

뒤

NOTICES IN THE CONSTRUCTION OF PRE-ENGINEERED BUILDINGS

12/08/2020

The process of construct the pre-engineered building has many potential risks in both equipment and human

nha thep tien che qh plus

 

Erecting the first components is deformed easily since the structural system is not connected yet so it is easy to lose stability under the impact of external factors such as wind and storms… or the mistake of crane driver that collides the steel structure being erected.

 

qh plus nha thep tien che

 

Notices In The Construction Of Pre-Engineered Buildings:

- Workers must always stay conscious and be healthy. It's must have full of labor protection and safety equipment when working on the frame

- Make sure the crane driver is always conscious and focused when working, not distracted during control crane equipment, ensuring safety for people and structural systems being erected

- Stop construction when the weather is bad (strong wind, heavy rain, storm)

- To build a safety pre-engineered building, the first step is to erect hard bracing at the gable. During erection, there must be temporary bracing. Use roof purlins, sidewall girts combine with cable braces to locate, bind the frames together. It is necessary to install enough rigid frame columns, rigid frame rafter, purlins, roof braces, wall braces, purlins, and a number of temporary cable braces from the rafter to the ground anchors.

- After installing the hard bracing, it is necessary to check and align the accuracy of the frame (altitude, permissible allowance, deflection ...). From there, install the following frames in series into the main bracing frame. If it is possible to fit the full amount of purlins, it is best to install at least 50% of the purlins of each compartment, gradually perfect the entire frame.

 

thi cong nha thep tien che

gia cong nha thep tien che

다른

TOP 10 OUTSTANDING BUILDING STEEL FABRICATION FACTORIES IN VIETNAM
QH PLUS STEEL STRUCTURES CO., LTD, already got EN ISO 3834-2:2006 certified by Bureau Veritas
QH PLUS COMPLETED THE INSTALLATION THE SPIRE CORE ON LANDMARK 81 TOWER
카테고리
뉴스
이벤트
영상
주요 뉴스
VUNG GOC CHARITY GIVES TET GIFTS 2022 TO PEOPLE WITH DIFFICULTY SITUATION
31/01/2022
QH PLUS INCREASE EXPORTED STEEL STRUCTURE TO THAILAND
17/09/2020
QH PLUS EXPORT STEEL STRUCTURE TO JAPAN
17/09/2020
QH PLUS APPLIES GREEN ENERGY INTO PRODUCTION
09/10/2020

181 Nguyen Huu Canh Street, Ward 22, Binh Thanh District, Hochiminh City.

(028) 38 99 40 88
+84 28 38994088
qhplus@qhplus.com
본사 위치

181 Nguyen Huu Canh Street, Ward 22, Binh Thanh District, Hochiminh City.

빠른 링크
  • 고용정보
  • 고객센터
  • E-Brochure 받기
고객센터
(028) 38 99 40 88
+84 28 38994088
qhplus@qhplus.com
빠른 링크
  • 고용정보
  • 고객센터
  • E-Brochure 받기
자매 웹사이트
  • www.thegioivinyl.com
  • www.homemas.com
  • www.phukienxaydung.vn

매수: (028) 38 99 40 88

고용정보: 090 909 0999

E-mail: qhplus@qhplus.com